{"product_id":"police-security-dover-1000-lumen-rechargeable-flashlight-usb-c-charging-cable-included-slide-focus-6-hour-runtime-impact-resistant-wbelt-clip","title":"Police Security Dover 1000 Lumen Rechargeable Flashlight – USB-C Charging Cable Included, Slide Focus, 6-Hour Runtime, Impact Resistant – w\/Belt Clip.","description":"\u003cul\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e Ultra-Bright Performance: Delivers a powerful 1000 lumens with a beam distance of up to 210 meters—ideal for mechanics, automotive work, and emergency situations.  \u003c\/span\u003e\u003c\/li\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e Long-Lasting \u0026amp; Rechargeable: Equipped with a high-capacity 18650 2600mAh lithium-ion battery for up to 6 hours of runtime on Low mode. Rechargeable via included USB-C cable.  \u003c\/span\u003e\u003c\/li\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e Versatile Lighting Modes: Features 3 adaptable settings—High (1000 lm), Low (250 lm), and Flash—for various lighting needs, plus Slide Focus for adjustable beam control.  \u003c\/span\u003e\u003c\/li\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e Durable \u0026amp; Portable: Impact resistant with a compact 6.65' body and integrated belt clip for easy everyday carry. Built to handle tough work environments.  \u003c\/span\u003e\u003c\/li\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e No stand alone batteries are sold with this product  \u003c\/span\u003e\u003c\/li\u003e  \u003c\/ul\u003e\u003cbr\u003e\u003c!-- show up to 2 reviews by default --\u003e                       \u003cp\u003e    \u003cspan\u003ePolice Security’s Dover rechargeable, 800 lumen LED flashlight, is optimal for automotive technicians and other professionals who demand long-term flashlight performance. With our Quik Connect USB charging system (cable included), this light functions with a 18650 rechargeable lithium-ion battery delivering up to 11 hours runtime. With high, low, flash modes and slide focus, this flashlight is immediately adaptable to a variety of situations.\u003c\/span\u003e    \u003c\/p\u003e","brand":"ARENAOX","offers":[{"title":"Default Title","offer_id":57457096819070,"sku":null,"price":62.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0975\/8212\/1342\/files\/71t80ZNzmvL._AC_SL1500.jpg?v=1779598364","url":"https:\/\/romaqay.com\/products\/police-security-dover-1000-lumen-rechargeable-flashlight-usb-c-charging-cable-included-slide-focus-6-hour-runtime-impact-resistant-wbelt-clip","provider":"romaqay","version":"1.0","type":"link"}